The City is moving forward with preliminary and final design efforts for the intersection design shown here. The existing connection between 170th Street and CSAH 21 will be closed and realigned with Revere Way to eliminate the existing offset intersection. A traffic study was completed in 2019 to evaluate the existing and future traffic operations and develop a recommended intersection design that accommodates the anticipated growth along the corridor.